Operating sequence

Plan a Wan 2.0 image-to-video test with authorized first frames, explicit motion, protected geometry, camera logic, and a version-aware review record.

  1. 01

    Prepare a rights-cleared first frame

    Document the source owner, permission, identity consent, product truth, and intended use. Crop to the delivery frame without hiding details the reviewer must protect.

  2. 02

    Assign motion without redesign

    Describe the subject action, environmental motion, camera path, timing, and end state. State that identity, object geometry, materials, layout, and lighting logic remain anchored to the image.

  3. 03

    Review the transition frame by frame

    Check identity, hands, geometry, background stability, physical behavior, camera continuity, and invented text or objects. Retain prompt, input, settings, output, date, reviewer, and rejection notes.